Infrastructure

Multimodal terminal situated on the right bank of the Scheldt between quay 364 – 406 in the port of Antwerp.

Area: 295.000 m ², quay length: 700m + 220m + 160m, depth till 15m

Barge capacity: 300.000 handlings a year
                               
Repair workshop: 3.600 m2
60 + 45 Reefer connections

Container depot with a capacity of 450.000 TEU

Handling Equipment:

  • 3 mobile cranes (Gottwald)
  • Quay length : 700m + 220m + 160m
  • 5 straddle carriers
  • 1 reach stacker
  • 8 empty container handlers
  • 2 forklifts
  • 60 + 46 reefer plugs

Barge capacity: 300.000 handlings a year
Depot capacity:  450.000 handlings a year